Solu Hydroelectric Project

  • The 23.5 MW project is a simple run off river scheme.
  • Mainly comprises of a 5.5m high, 26m long diversion weir, side intake, surface de-silting basin and pipeline (water conveyance system) of 3680m length and 2.5m diameter, inclined steel surge tank, surface penstock, surface powerhouse and tailrace canal.
  • Design discharge is 12.26m3/sec and head of the project is 229.30m.
  • Project already commissioned.
Close Menu