The 2.8 MW project is a simple run off river scheme.
Mainly comprises of a 4m high, 6m long diversion weir, side intake, surface desilting basin and pipe line (water conveyance system) of 1295m length and 1.5m diameter, surface penstock, surface powerhouse and tailrace canal.
Design discharge is 3.60m3/sec and rated net head of the project is 92.22m.
Power produced will be sold to Nepal Electricity Authority.
The transmission line to be built by the company will be 3Km. long.